| 1 |
C Copyright(C) 1999-2020 National Technology & Engineering Solutions |
| 2 |
C of Sandia, LLC (NTESS). Under the terms of Contract DE-NA0003525 with |
| 3 |
C NTESS, the U.S. Government retains certain rights in this software. |
| 4 |
C |
| 5 |
C See packages/seacas/LICENSE for details |
| 6 |
|
| 7 |
C======================================================================= |
| 8 |
SUBROUTINE ORD8NP (NELBLK, LENE, NLNKE, LINKE) |
| 9 |
C======================================================================= |
| 10 |
|
| 11 |
C --*** ORD8NP *** (BLOT) Order 8-node 2D elements |
| 12 |
C -- Modified by John H. Glick -- 10/25/88 |
| 13 |
C -- Written by Amy Gilkey, revised 10/29/87 |
| 14 |
C -- |
| 15 |
C --ORD8NP orders the nodes of 8 and 9 node 2D elements so that they are |
| 16 |
C --connected. Normally nodes are ordered 1-2-3-4-5-6-7-8-9, where nodes |
| 17 |
C --1 to 4 are corner nodes, 5 to 8 are side nodes, and 9 is the center |
| 18 |
C --node. The nodes are returned as 1-5-2-6-3-7-4-8-9. |
| 19 |
C -- |
| 20 |
C --Parameters: |
| 21 |
C -- NELBLK - IN - the number of element blocks |
| 22 |
C -- LENE - IN - the cumulative element counts by element block |
| 23 |
C -- NLNKE - IN - the number of nodes per element |
| 24 |
C -- LINK - IN/OUT - the element connectivity |
| 25 |
|
| 26 |
INTEGER LENE(0:*), LINKE(*) |
| 27 |
INTEGER NLNKE(*) |
| 28 |
|
| 29 |
INTEGER L(9) |
| 30 |
|
| 31 |
DO 140 IELB = 1, NELBLK |
| 32 |
IF ((NLNKE(IELB) .EQ. 8)) THEN |
| 33 |
IXL0 = IDBLNK (IELB, 0, LENE, NLNKE) - 1 |
| 34 |
DO 110 IEL = LENE(IELB-1)+1, LENE(IELB) |
| 35 |
L(1) = LINKE(IXL0+1) |
| 36 |
L(2) = LINKE(IXL0+5) |
| 37 |
L(3) = LINKE(IXL0+2) |
| 38 |
L(4) = LINKE(IXL0+6) |
| 39 |
L(5) = LINKE(IXL0+3) |
| 40 |
L(6) = LINKE(IXL0+7) |
| 41 |
L(7) = LINKE(IXL0+4) |
| 42 |
L(8) = LINKE(IXL0+8) |
| 43 |
DO 100 K = 1, NLNKE(IELB) |
| 44 |
LINKE(IXL0+K) = L(K) |
| 45 |
100 CONTINUE |
| 46 |
IXL0 = IXL0 + NLNKE(IELB) |
| 47 |
110 CONTINUE |
| 48 |
ELSE IF ((NLNKE(IELB) .EQ. 9)) THEN |
| 49 |
IXL0 = IDBLNK (IELB, 0, LENE, NLNKE) - 1 |
| 50 |
DO 130 IEL = LENE(IELB-1)+1, LENE(IELB) |
| 51 |
L(1) = LINKE(IXL0+1) |
| 52 |
L(2) = LINKE(IXL0+5) |
| 53 |
L(3) = LINKE(IXL0+2) |
| 54 |
L(4) = LINKE(IXL0+6) |
| 55 |
L(5) = LINKE(IXL0+3) |
| 56 |
L(6) = LINKE(IXL0+7) |
| 57 |
L(7) = LINKE(IXL0+4) |
| 58 |
L(8) = LINKE(IXL0+8) |
| 59 |
L(9) = LINKE(IXL0+9) |
| 60 |
DO 120 K = 1, NLNKE(IELB) |
| 61 |
LINKE(IXL0+K) = L(K) |
| 62 |
120 CONTINUE |
| 63 |
IXL0 = IXL0 + NLNKE(IELB) |
| 64 |
130 CONTINUE |
| 65 |
END IF |
| 66 |
140 CONTINUE |
| 67 |
|
| 68 |
RETURN |
| 69 |
END |