| 1 |
<h2 id="instructions">Instructions</h2> |
| 2 |
<hr> |
| 3 |
<ul> |
| 4 |
<li>Connect PV1 to A1, change PV1 using slider and watch A1 changing. Try with PV2 & A2</li> |
| 5 |
<li>Connect different capacitors between IN1 to Ground and measure them.</li> |
| 6 |
<li>Measure Resistors (Accuracy is less for values < 100 Ohm and > 100 kOhm)</li> |
| 7 |
<li>Connect SQ1 to IN2 and measure the frequency. Change it using slider and measure again.</li> |
| 8 |
<li>Connect 1000 Ohms from CCS (1.1mA) to ground, Connect CCS to A1. Enable CCS and note the voltage</li> |
| 9 |
</ul> |