| 1 |
========= |
| 2 |
Schedutil |
| 3 |
========= |
| 4 |
|
| 5 |
.. note:: |
| 6 |
|
| 7 |
All this assumes a linear relation between frequency and work capacity, |
| 8 |
we know this is flawed, but it is the best workable approximation. |
| 9 |
|
| 10 |
|
| 11 |
PELT (Per Entity Load Tracking) |
| 12 |
=============================== |
| 13 |
|
| 14 |
With PELT we track some metrics across the various scheduler entities, from |
| 15 |
individual tasks to task-group slices to CPU runqueues. As the basis for this |
| 16 |
we use an Exponentially Weighted Moving Average (EWMA), each period (1024us) |
| 17 |
is decayed such that y^32 = 0.5. That is, the most recent 32ms contribute |
| 18 |
half, while the rest of history contribute the other half. |
| 19 |
|
| 20 |
Specifically: |
| 21 |
|
| 22 |
ewma_sum(u) := u_0 + u_1*y + u_2*y^2 + ... |
| 23 |
|
| 24 |
ewma(u) = ewma_sum(u) / ewma_sum(1) |
| 25 |
|
| 26 |
Since this is essentially a progression of an infinite geometric series, the |
| 27 |
results are composable, that is ewma(A) + ewma(B) = ewma(A+B). This property |
| 28 |
is key, since it gives the ability to recompose the averages when tasks move |
| 29 |
around. |
| 30 |
|
| 31 |
Note that blocked tasks still contribute to the aggregates (task-group slices |
| 32 |
and CPU runqueues), which reflects their expected contribution when they |
| 33 |
resume running. |
| 34 |
|
| 35 |
Using this we track 2 key metrics: 'running' and 'runnable'. 'Running' |
| 36 |
reflects the time an entity spends on the CPU, while 'runnable' reflects the |
| 37 |
time an entity spends on the runqueue. When there is only a single task these |
| 38 |
two metrics are the same, but once there is contention for the CPU 'running' |
| 39 |
will decrease to reflect the fraction of time each task spends on the CPU |
| 40 |
while 'runnable' will increase to reflect the amount of contention. |
| 41 |
|
| 42 |
For more detail see: kernel/sched/pelt.c |
| 43 |
|
| 44 |
|
| 45 |
Frequency / CPU Invariance |
| 46 |
========================== |
| 47 |
|
| 48 |
Because consuming the CPU for 50% at 1GHz is not the same as consuming the CPU |
| 49 |
for 50% at 2GHz, nor is running 50% on a LITTLE CPU the same as running 50% on |
| 50 |
a big CPU, we allow architectures to scale the time delta with two ratios, one |
| 51 |
Dynamic Voltage and Frequency Scaling (DVFS) ratio and one microarch ratio. |
| 52 |
|
| 53 |
For simple DVFS architectures (where software is in full control) we trivially |
| 54 |
compute the ratio as:: |
| 55 |
|
| 56 |
f_cur |
| 57 |
r_dvfs := ----- |
| 58 |
f_max |
| 59 |
|
| 60 |
For more dynamic systems where the hardware is in control of DVFS we use |
| 61 |
hardware counters (Intel APERF/MPERF, ARMv8.4-AMU) to provide us this ratio. |
| 62 |
For Intel specifically, we use:: |
| 63 |
|
| 64 |
APERF |
| 65 |
f_cur := ----- * P0 |
| 66 |
MPERF |
| 67 |
|
| 68 |
4C-turbo; if available and turbo enabled |
| 69 |
f_max := { 1C-turbo; if turbo enabled |
| 70 |
P0; otherwise |
| 71 |
|
| 72 |
f_cur |
| 73 |
r_dvfs := min( 1, ----- ) |
| 74 |
f_max |
| 75 |
|
| 76 |
We pick 4C turbo over 1C turbo to make it slightly more sustainable. |
| 77 |
|
| 78 |
r_cpu is determined as the ratio of highest performance level of the current |
| 79 |
CPU vs the highest performance level of any other CPU in the system. |
| 80 |
|
| 81 |
r_tot = r_dvfs * r_cpu |
| 82 |
|
| 83 |
The result is that the above 'running' and 'runnable' metrics become invariant |
| 84 |
of DVFS and CPU type. IOW. we can transfer and compare them between CPUs. |
| 85 |
|
| 86 |
For more detail see: |
| 87 |
|
| 88 |
- kernel/sched/pelt.h:update_rq_clock_pelt() |
| 89 |
- arch/x86/kernel/smpboot.c:"APERF/MPERF frequency ratio computation." |
| 90 |
- Documentation/scheduler/sched-capacity.rst:"1. CPU Capacity + 2. Task utilization" |
| 91 |
|
| 92 |
|
| 93 |
UTIL_EST |
| 94 |
======== |
| 95 |
|
| 96 |
Because periodic tasks have their averages decayed while they sleep, even |
| 97 |
though when running their expected utilization will be the same, they suffer a |
| 98 |
(DVFS) ramp-up after they are running again. |
| 99 |
|
| 100 |
To alleviate this (a default enabled option) UTIL_EST drives an Infinite |
| 101 |
Impulse Response (IIR) EWMA with the 'running' value on dequeue -- when it is |
| 102 |
highest. UTIL_EST filters to instantly increase and only decay on decrease. |
| 103 |
|
| 104 |
A further runqueue wide sum (of runnable tasks) is maintained of: |
| 105 |
|
| 106 |
util_est := \Sum_t max( t_running, t_util_est_ewma ) |
| 107 |
|
| 108 |
For more detail see: kernel/sched/fair.c:util_est_dequeue() |
| 109 |
|
| 110 |
|
| 111 |
UCLAMP |
| 112 |
====== |
| 113 |
|
| 114 |
It is possible to set effective u_min and u_max clamps on each CFS or RT task; |
| 115 |
the runqueue keeps an max aggregate of these clamps for all running tasks. |
| 116 |
|
| 117 |
For more detail see: include/uapi/linux/sched/types.h |
| 118 |
|
| 119 |
|
| 120 |
Schedutil / DVFS |
| 121 |
================ |
| 122 |
|
| 123 |
Every time the scheduler load tracking is updated (task wakeup, task |
| 124 |
migration, time progression) we call out to schedutil to update the hardware |
| 125 |
DVFS state. |
| 126 |
|
| 127 |
The basis is the CPU runqueue's 'running' metric, which per the above it is |
| 128 |
the frequency invariant utilization estimate of the CPU. From this we compute |
| 129 |
a desired frequency like:: |
| 130 |
|
| 131 |
max( running, util_est ); if UTIL_EST |
| 132 |
u_cfs := { running; otherwise |
| 133 |
|
| 134 |
clamp( u_cfs + u_rt , u_min, u_max ); if UCLAMP_TASK |
| 135 |
u_clamp := { u_cfs + u_rt; otherwise |
| 136 |
|
| 137 |
u := u_clamp + u_irq + u_dl; [approx. see source for more detail] |
| 138 |
|
| 139 |
f_des := min( f_max, 1.25 u * f_max ) |
| 140 |
|
| 141 |
XXX IO-wait: when the update is due to a task wakeup from IO-completion we |
| 142 |
boost 'u' above. |
| 143 |
|
| 144 |
This frequency is then used to select a P-state/OPP or directly munged into a |
| 145 |
CPPC style request to the hardware. |
| 146 |
|
| 147 |
XXX: deadline tasks (Sporadic Task Model) allows us to calculate a hard f_min |
| 148 |
required to satisfy the workload. |
| 149 |
|
| 150 |
Because these callbacks are directly from the scheduler, the DVFS hardware |
| 151 |
interaction should be 'fast' and non-blocking. Schedutil supports |
| 152 |
rate-limiting DVFS requests for when hardware interaction is slow and |
| 153 |
expensive, this reduces effectiveness. |
| 154 |
|
| 155 |
For more information see: kernel/sched/cpufreq_schedutil.c |
| 156 |
|
| 157 |
|
| 158 |
NOTES |
| 159 |
===== |
| 160 |
|
| 161 |
- On low-load scenarios, where DVFS is most relevant, the 'running' numbers |
| 162 |
will closely reflect utilization. |
| 163 |
|
| 164 |
- In saturated scenarios task movement will cause some transient dips, |
| 165 |
suppose we have a CPU saturated with 4 tasks, then when we migrate a task |
| 166 |
to an idle CPU, the old CPU will have a 'running' value of 0.75 while the |
| 167 |
new CPU will gain 0.25. This is inevitable and time progression will |
| 168 |
correct this. XXX do we still guarantee f_max due to no idle-time? |
| 169 |
|
| 170 |
- Much of the above is about avoiding DVFS dips, and independent DVFS domains |
| 171 |
having to re-learn / ramp-up when load shifts. |
| 172 |
|