| 1 |
========================== |
| 2 |
Real-Time group scheduling |
| 3 |
========================== |
| 4 |
|
| 5 |
.. CONTENTS |
| 6 |
|
| 7 |
0. WARNING |
| 8 |
1. Overview |
| 9 |
1.1 The problem |
| 10 |
1.2 The solution |
| 11 |
2. The interface |
| 12 |
2.1 System-wide settings |
| 13 |
2.2 Default behaviour |
| 14 |
2.3 Basis for grouping tasks |
| 15 |
3. Future plans |
| 16 |
|
| 17 |
|
| 18 |
0. WARNING |
| 19 |
========== |
| 20 |
|
| 21 |
Fiddling with these settings can result in an unstable system, the knobs are |
| 22 |
root only and assumes root knows what he is doing. |
| 23 |
|
| 24 |
Most notable: |
| 25 |
|
| 26 |
* very small values in sched_rt_period_us can result in an unstable |
| 27 |
system when the period is smaller than either the available hrtimer |
| 28 |
resolution, or the time it takes to handle the budget refresh itself. |
| 29 |
|
| 30 |
* very small values in sched_rt_runtime_us can result in an unstable |
| 31 |
system when the runtime is so small the system has difficulty making |
| 32 |
forward progress (NOTE: the migration thread and kstopmachine both |
| 33 |
are real-time processes). |
| 34 |
|
| 35 |
1. Overview |
| 36 |
=========== |
| 37 |
|
| 38 |
|
| 39 |
1.1 The problem |
| 40 |
--------------- |
| 41 |
|
| 42 |
Real-time scheduling is all about determinism, a group has to be able to rely on |
| 43 |
the amount of bandwidth (eg. CPU time) being constant. In order to schedule |
| 44 |
multiple groups of real-time tasks, each group must be assigned a fixed portion |
| 45 |
of the CPU time available. Without a minimum guarantee a real-time group can |
| 46 |
obviously fall short. A fuzzy upper limit is of no use since it cannot be |
| 47 |
relied upon. Which leaves us with just the single fixed portion. |
| 48 |
|
| 49 |
1.2 The solution |
| 50 |
---------------- |
| 51 |
|
| 52 |
CPU time is divided by means of specifying how much time can be spent running |
| 53 |
in a given period. We allocate this "run time" for each real-time group which |
| 54 |
the other real-time groups will not be permitted to use. |
| 55 |
|
| 56 |
Any time not allocated to a real-time group will be used to run normal priority |
| 57 |
tasks (SCHED_OTHER). Any allocated run time not used will also be picked up by |
| 58 |
SCHED_OTHER. |
| 59 |
|
| 60 |
Let's consider an example: a frame fixed real-time renderer must deliver 25 |
| 61 |
frames a second, which yields a period of 0.04s per frame. Now say it will also |
| 62 |
have to play some music and respond to input, leaving it with around 80% CPU |
| 63 |
time dedicated for the graphics. We can then give this group a run time of 0.8 |
| 64 |
* 0.04s = 0.032s. |
| 65 |
|
| 66 |
This way the graphics group will have a 0.04s period with a 0.032s run time |
| 67 |
limit. Now if the audio thread needs to refill the DMA buffer every 0.005s, but |
| 68 |
needs only about 3% CPU time to do so, it can do with a 0.03 * 0.005s = |
| 69 |
0.00015s. So this group can be scheduled with a period of 0.005s and a run time |
| 70 |
of 0.00015s. |
| 71 |
|
| 72 |
The remaining CPU time will be used for user input and other tasks. Because |
| 73 |
real-time tasks have explicitly allocated the CPU time they need to perform |
| 74 |
their tasks, buffer underruns in the graphics or audio can be eliminated. |
| 75 |
|
| 76 |
NOTE: the above example is not fully implemented yet. We still |
| 77 |
lack an EDF scheduler to make non-uniform periods usable. |
| 78 |
|
| 79 |
|
| 80 |
2. The Interface |
| 81 |
================ |
| 82 |
|
| 83 |
|
| 84 |
2.1 System wide settings |
| 85 |
------------------------ |
| 86 |
|
| 87 |
The system wide settings are configured under the /proc virtual file system: |
| 88 |
|
| 89 |
/proc/sys/kernel/sched_rt_period_us: |
| 90 |
The scheduling period that is equivalent to 100% CPU bandwidth. |
| 91 |
|
| 92 |
/proc/sys/kernel/sched_rt_runtime_us: |
| 93 |
A global limit on how much time real-time scheduling may use. This is always |
| 94 |
less or equal to the period_us, as it denotes the time allocated from the |
| 95 |
period_us for the real-time tasks. Without CONFIG_RT_GROUP_SCHED enabled, |
| 96 |
this only serves for admission control of deadline tasks. With |
| 97 |
CONFIG_RT_GROUP_SCHED=y it also signifies the total bandwidth available to |
| 98 |
all real-time groups. |
| 99 |
|
| 100 |
* Time is specified in us because the interface is s32. This gives an |
| 101 |
operating range from 1us to about 35 minutes. |
| 102 |
* sched_rt_period_us takes values from 1 to INT_MAX. |
| 103 |
* sched_rt_runtime_us takes values from -1 to sched_rt_period_us. |
| 104 |
* A run time of -1 specifies runtime == period, ie. no limit. |
| 105 |
* sched_rt_runtime_us/sched_rt_period_us > 0.05 inorder to preserve |
| 106 |
bandwidth for fair dl_server. For accurate value check average of |
| 107 |
runtime/period in /sys/kernel/debug/sched/fair_server/cpuX/ |
| 108 |
|
| 109 |
|
| 110 |
2.2 Default behaviour |
| 111 |
--------------------- |
| 112 |
|
| 113 |
The default values for sched_rt_period_us (1000000 or 1s) and |
| 114 |
sched_rt_runtime_us (950000 or 0.95s). This gives 0.05s to be used by |
| 115 |
SCHED_OTHER (non-RT tasks). These defaults were chosen so that a run-away |
| 116 |
real-time tasks will not lock up the machine but leave a little time to recover |
| 117 |
it. By setting runtime to -1 you'd get the old behaviour back. |
| 118 |
|
| 119 |
By default all bandwidth is assigned to the root group and new groups get the |
| 120 |
period from /proc/sys/kernel/sched_rt_period_us and a run time of 0. If you |
| 121 |
want to assign bandwidth to another group, reduce the root group's bandwidth |
| 122 |
and assign some or all of the difference to another group. |
| 123 |
|
| 124 |
Real-time group scheduling means you have to assign a portion of total CPU |
| 125 |
bandwidth to the group before it will accept real-time tasks. Therefore you will |
| 126 |
not be able to run real-time tasks as any user other than root until you have |
| 127 |
done that, even if the user has the rights to run processes with real-time |
| 128 |
priority! |
| 129 |
|
| 130 |
|
| 131 |
2.3 Basis for grouping tasks |
| 132 |
---------------------------- |
| 133 |
|
| 134 |
Enabling CONFIG_RT_GROUP_SCHED lets you explicitly allocate real |
| 135 |
CPU bandwidth to task groups. |
| 136 |
|
| 137 |
This uses the cgroup virtual file system and "<cgroup>/cpu.rt_runtime_us" |
| 138 |
to control the CPU time reserved for each control group. |
| 139 |
|
| 140 |
For more information on working with control groups, you should read |
| 141 |
Documentation/admin-guide/cgroup-v1/cgroups.rst as well. |
| 142 |
|
| 143 |
Group settings are checked against the following limits in order to keep the |
| 144 |
configuration schedulable: |
| 145 |
|
| 146 |
\Sum_{i} runtime_{i} / global_period <= global_runtime / global_period |
| 147 |
|
| 148 |
For now, this can be simplified to just the following (but see Future plans): |
| 149 |
|
| 150 |
\Sum_{i} runtime_{i} <= global_runtime |
| 151 |
|
| 152 |
|
| 153 |
3. Future plans |
| 154 |
=============== |
| 155 |
|
| 156 |
There is work in progress to make the scheduling period for each group |
| 157 |
("<cgroup>/cpu.rt_period_us") configurable as well. |
| 158 |
|
| 159 |
The constraint on the period is that a subgroup must have a smaller or |
| 160 |
equal period to its parent. But realistically its not very useful _yet_ |
| 161 |
as its prone to starvation without deadline scheduling. |
| 162 |
|
| 163 |
Consider two sibling groups A and B; both have 50% bandwidth, but A's |
| 164 |
period is twice the length of B's. |
| 165 |
|
| 166 |
* group A: period=100000us, runtime=50000us |
| 167 |
|
| 168 |
- this runs for 0.05s once every 0.1s |
| 169 |
|
| 170 |
* group B: period= 50000us, runtime=25000us |
| 171 |
|
| 172 |
- this runs for 0.025s twice every 0.1s (or once every 0.05 sec). |
| 173 |
|
| 174 |
This means that currently a while (1) loop in A will run for the full period of |
| 175 |
B and can starve B's tasks (assuming they are of lower priority) for a whole |
| 176 |
period. |
| 177 |
|
| 178 |
The next project will be SCHED_EDF (Earliest Deadline First scheduling) to bring |
| 179 |
full deadline scheduling to the linux kernel. Deadline scheduling the above |
| 180 |
groups and treating end of the period as a deadline will ensure that they both |
| 181 |
get their allocated time. |
| 182 |
|
| 183 |
Implementing SCHED_EDF might take a while to complete. Priority Inheritance is |
| 184 |
the biggest challenge as the current linux PI infrastructure is geared towards |
| 185 |
the limited static priority levels 0-99. With deadline scheduling you need to |
| 186 |
do deadline inheritance (since priority is inversely proportional to the |
| 187 |
deadline delta (deadline - now)). |
| 188 |
|
| 189 |
This means the whole PI machinery will have to be reworked - and that is one of |
| 190 |
the most complex pieces of code we have. |