1 @sequence
2 Feature: Sequence
3
4 Scenario: Add work plan
5 Given an empty IFC project
6 When I press "bim.add_work_plan"
7 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
8 Then nothing happens
9
10 Scenario: Add Work schedule
11 Given an empty IFC project
12 When I press "bim.add_work_schedule"
13 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
14 Then nothing happens
15
16 Scenario: Remove work plan
17 Given an empty IFC project
18 When I press "bim.add_work_plan"
19 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
20 When I press "bim.remove_work_plan(work_plan={work_plan})"
21 Then nothing happens
22
23 Scenario: Remove work schedule
24 Given an empty IFC project
25 When I press "bim.add_work_schedule"
26 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
27 When I press "bim.remove_work_schedule(work_schedule={work_schedule})"
28 Then nothing happens
29
30 Scenario: Enable Editing Work Plan
31 Given an empty IFC project
32 When I press "bim.add_work_plan"
33 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
34 When I press "bim.enable_editing_work_plan(work_plan={work_plan})"
35 Then nothing happens
36
37 Scenario: Edit Work Plan
38 Given an empty IFC project
39 When I press "bim.add_work_plan"
40 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
41 And I press "bim.enable_editing_work_plan(work_plan={work_plan})"
42 And I set "scene.BIMWorkPlanProperties.work_plan_attributes.get('Name').string_value" to "FooPlan"
43 When I press "bim.edit_work_plan()"
44 Then nothing happens
45
46 Scenario: Edit Work Schedule
47 Given an empty IFC project
48 When I press "bim.add_work_schedule"
49 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
50 And I press "bim.enable_editing_work_schedule(work_schedule={work_schedule})"
51 And I set "scene.BIMWorkScheduleProperties.work_schedule_attributes.get('Name').string_value" to "FooSchedule"
52 When I press "bim.edit_work_schedule()"
53 Then nothing happens
54
55 Scenario: Disable Editing Work Plan
56 Given an empty IFC project
57 When I press "bim.add_work_plan"
58 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
59 And I press "bim.enable_editing_work_plan_schedules(work_plan={work_plan})"
60 When I press "bim.disable_editing_work_plan"
61 Then nothing happens
62
63 Scenario: Assign work schedule
64 Given an empty IFC project
65 When I press "bim.add_work_schedule"
66 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
67 When I press "bim.add_work_plan"
68 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
69 And I press "bim.enable_editing_work_plan_schedules(work_plan={work_plan})"
70 And I press "bim.assign_work_schedule(work_plan={work_plan}, work_schedule={work_schedule})"
71 Then nothing happens
72
73 Scenario: Unassign work schedule
74 Given an empty IFC project
75 When I press "bim.add_work_schedule"
76 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
77 When I press "bim.add_work_plan"
78 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
79 And I press "bim.enable_editing_work_plan_schedules(work_plan={work_plan})"
80 And I press "bim.assign_work_schedule(work_plan={work_plan}, work_schedule={work_schedule})"
81 And I press "bim.unassign_work_schedule(work_plan={work_plan}, work_schedule={work_schedule})"
82 Then nothing happens
83
84 Scenario: Delete assigned work schedule
85 Given an empty IFC project
86 When I press "bim.add_work_schedule"
87 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
88 When I press "bim.add_work_plan"
89 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
90 And I press "bim.enable_editing_work_plan_schedules(work_plan={work_plan})"
91 And I press "bim.assign_work_schedule(work_plan={work_plan}, work_schedule={work_schedule})"
92 When I press "bim.remove_work_schedule(work_schedule={work_schedule})"
93 Then nothing happens
94
95 Scenario: Remove Assigned work schedule
96 Given an empty IFC project
97 When I press "bim.add_work_schedule"
98 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
99 When I press "bim.add_work_plan"
100 And the variable "work_plan" is "IfcStore.get_file().by_type('IfcWorkPlan')[0].id()"
101 And I press "bim.enable_editing_work_plan_schedules(work_plan={work_plan})"
102 When I press "bim.assign_work_schedule(work_plan={work_plan}, work_schedule={work_schedule})"
103 Then nothing happens
104
105 Scenario: Add work calendar
106 Given an empty IFC project
107 When I press "bim.add_work_calendar"
108 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
109 Then nothing happens
110
111 Scenario: Remove work calendar
112 Given an empty IFC project
113 When I press "bim.add_work_calendar"
114 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
115 When I press "bim.remove_work_calendar(work_calendar={work_calendar})"
116 Then nothing happens
117
118 Scenario: Edit work calendar attributes
119 Given an empty IFC project
120 When I press "bim.add_work_calendar"
121 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
122 When I press "bim.enable_editing_work_calendar(work_calendar={work_calendar})"
123 And I set "scene.BIMWorkCalendarProperties.work_calendar_attributes.get('Name').string_value" to "FooCalendar"
124 When I press "bim.edit_work_calendar()"
125 Then nothing happens
126
127 Scenario: Enable editing calendar times
128 Given an empty IFC project
129 When I press "bim.add_work_calendar"
130 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
131 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
132 Then nothing happens
133
134 Scenario: Add calendar Working Time
135 Given an empty IFC project
136 When I press "bim.add_work_calendar"
137 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
138 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
139 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="WorkingTimes")"
140 Then nothing happens
141
142 Scenario: Add calendar Exception Time
143 Given an empty IFC project
144 When I press "bim.add_work_calendar"
145 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
146 And I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
147 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="ExceptionTimes")"
148 Then nothing happens
149
150 Scenario: Enable editing Working Time Attributes
151 Given an empty IFC project
152 When I press "bim.add_work_calendar"
153 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
154 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
155 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="WorkingTimes")"
156 And the variable "work_time" is "IfcStore.get_file().by_type('IfcWorkTime')[0].id()"
157 When I press "bim.enable_editing_work_time(work_time={work_time})"
158
159 Scenario: Edit Working Time Start and End Period
160 Given an empty IFC project
161 When I press "bim.add_work_calendar"
162 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
163 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
164 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type='WorkingTimes')"
165 And the variable "work_time" is "IfcStore.get_file().by_type('IfcWorkTime')[0].id()"
166 When I press "bim.enable_editing_work_time(work_time={work_time})"
167 And I set "scene.BIMWorkCalendarProperties.work_time_attributes.get('Start').string_value" to "2021-01-01"
168 And I set "scene.BIMWorkCalendarProperties.work_time_attributes.get('Finish').string_value" to "2022-01-01"
169 When I press "bim.edit_work_time()"
170 Then nothing happens
171
172 Scenario: Add Working Time Period
173 Given an empty IFC project
174 When I press "bim.add_work_calendar"
175 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
176 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
177 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type='WorkingTimes')"
178 And the variable "work_time" is "IfcStore.get_file().by_type('IfcWorkTime')[0].id()"
179 When I press "bim.enable_editing_work_time(work_time={work_time})"
180 When I press "bim.assign_recurrence_pattern(work_time={work_time}, recurrence_type='DAILY')"
181 And the variable "recurrence_pattern" is "IfcStore.get_file().by_type('IfcRecurrencePattern')[0].id()"
182 And I set "scene.BIMWorkCalendarProperties.start_time" to "9AM"
183 And I set "scene.BIMWorkCalendarProperties.end_time" to "1PM"
184 When I press "bim.add_time_period(recurrence_pattern={recurrence_pattern})"
185 When I press "bim.edit_work_time()"
186 Then nothing happens
187
188 Scenario: Edit Working Time start finish and time period
189 Given an empty IFC project
190 When I press "bim.add_work_calendar"
191 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
192 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
193 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type='WorkingTimes')"
194 And the variable "work_time" is "IfcStore.get_file().by_type('IfcWorkTime')[0].id()"
195 When I press "bim.enable_editing_work_time(work_time={work_time})"
196 And I set "scene.BIMWorkCalendarProperties.work_time_attributes.get('Start').string_value" to "2021-01-01"
197 And I set "scene.BIMWorkCalendarProperties.work_time_attributes.get('Finish').string_value" to "2022-01-01"
198 When I press "bim.assign_recurrence_pattern(work_time={work_time}, recurrence_type='DAILY')"
199 And the variable "recurrence_pattern" is "IfcStore.get_file().by_type('IfcRecurrencePattern')[0].id()"
200 And I set "scene.BIMWorkCalendarProperties.start_time" to "9AM"
201 And I set "scene.BIMWorkCalendarProperties.end_time" to "1PM"
202 When I press "bim.add_time_period(recurrence_pattern={recurrence_pattern})"
203 When I press "bim.edit_work_time()"
204 Then nothing happens
205
206
207 Scenario: Unassign Calendar to task
208 Given an empty IFC project
209 When I press "bim.add_work_calendar"
210 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
211 When I press "bim.add_work_schedule"
212 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
213 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
214 And I press "bim.add_summary_task(work_schedule={work_schedule})"
215 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
216 And I press "bim.enable_editing_task_calendar(task={task})"
217 And I press "bim.edit_task_calendar(work_calendar={work_calendar}, task={task})"
218 When I press "bim.remove_task_calendar(work_calendar={work_calendar}, task={task})"
219 Then nothing happens
220
221 Scenario: Enable editing task
222 Given an empty IFC project
223 And I press "bim.add_work_schedule"
224 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
225 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
226 And I press "bim.add_summary_task(work_schedule={work_schedule})"
227 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
228 When I press "bim.enable_editing_task_attributes(task={task})"
229 Then nothing happens
230
231 Scenario: Copy task attribute
232 Given an empty IFC project
233 And I press "bim.add_work_schedule"
234 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
235 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
236 And I press "bim.add_summary_task(work_schedule={work_schedule})"
237 And I press "bim.add_summary_task(work_schedule={work_schedule})"
238 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
239 And I press "bim.enable_editing_task_attributes(task={task})"
240 And I set "scene.BIMWorkScheduleProperties.task_attributes[2].string_value" to "Foo"
241 When I set "scene.BIMTaskTreeProperties.tasks[1].is_selected" to "True"
242 And I press "bim.copy_task_attribute(name='Description')"
243 Then nothing happens
244
245 Scenario: Unassign task Successor
246 Given an empty IFC project
247 When I press "bim.add_work_schedule"
248 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
249 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
250 When I press "bim.add_summary_task(work_schedule={work_schedule})"
251 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
252 When I press "bim.add_task(task={task})"
253 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
254 When I press "bim.add_task(task={task})"
255 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
256 And I press "bim.enable_editing_task_attributes(task={nested_task_one})"
257 And I press "bim.assign_successor(task={nested_task_two})"
258 When I press "bim.unassign_successor(task={nested_task_two})"
259 Then nothing happens
260
261 Scenario: Edit time Lag
262 Given an empty IFC project
263 When I press "bim.add_work_schedule"
264 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
265 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
266 When I press "bim.add_summary_task(work_schedule={work_schedule})"
267 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
268 When I press "bim.add_task(task={task})"
269 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
270 When I press "bim.add_task(task={task})"
271 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
272 And I press "bim.enable_editing_task_attributes(task={nested_task_one})"
273 When I press "bim.assign_successor(task={nested_task_two})"
274 And the variable "rel_sequence" is "IfcStore.get_file().by_type('IfcRelSequence')[0].id()"
275 When I press "bim.assign_lag_time(sequence={rel_sequence})"
276 And the variable "lag_time" is "IfcStore.get_file().by_type('IfcLagTime')[0].id()"
277 And I press "bim.enable_editing_sequence_lag_time(sequence={rel_sequence}, lag_time={lag_time})"
278 And I set "scene.BIMWorkScheduleProperties.lag_time_attributes.get('LagValue').string_value" to "P5D"
279 When I press "bim.edit_sequence_lag_time(lag_time={lag_time})"
280 Then nothing happens
281
282 Scenario: Unassign time Lag
283 Given an empty IFC project
284 When I press "bim.add_work_schedule"
285 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
286 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
287 When I press "bim.add_summary_task(work_schedule={work_schedule})"
288 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
289 When I press "bim.add_task(task={task})"
290 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
291 When I press "bim.add_task(task={task})"
292 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
293 And I press "bim.enable_editing_task_attributes(task={nested_task_one})"
294 When I press "bim.assign_successor(task={nested_task_two})"
295 And the variable "rel_sequence" is "IfcStore.get_file().by_type('IfcRelSequence')[0].id()"
296 When I press "bim.assign_lag_time(sequence={rel_sequence})"
297 And the variable "lag_time" is "IfcStore.get_file().by_type('IfcLagTime')[0].id()"
298 When I press "bim.unassign_lag_time(sequence={rel_sequence})"
299 Then nothing happens
300
301 Scenario: Edit Sequence Relationship
302 Given an empty IFC project
303 When I press "bim.add_work_schedule"
304 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
305 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
306 When I press "bim.add_summary_task(work_schedule={work_schedule})"
307 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
308 When I press "bim.add_task(task={task})"
309 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
310 When I press "bim.add_task(task={task})"
311 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
312 And I press "bim.enable_editing_task_attributes(task={nested_task_one})"
313 When I press "bim.assign_successor(task={nested_task_two})"
314 And the variable "rel_sequence" is "IfcStore.get_file().by_type('IfcRelSequence')[0].id()"
315 And I press "bim.enable_editing_sequence_attributes(sequence={rel_sequence})"
316 And I set "scene.BIMWorkScheduleProperties.sequence_attributes.get('SequenceType').enum_value" to "START_START"
317 When I press "bim.edit_sequence_attributes()"
318 Then nothing happens
319
320 Scenario: See the current frame date as text
321 Given an empty IFC project
322 And I press "bim.add_work_schedule"
323 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
324 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
325 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
326 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
327 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
328 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
329 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
330 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
331 When I am on frame "1"
332 Then the object "Timeline" has a body of "2021-01-01"
333 When I am on frame "2"
334 Then the object "Timeline" has a body of "2021-01-02"
335
336 Scenario: Animate the construction of a wall
337 Given an empty IFC project
338 And I press "bim.add_work_schedule"
339 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
340 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
341 And I press "bim.add_summary_task(work_schedule={work_schedule})"
342 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
343 And I press "bim.enable_editing_task_attributes(task={task})"
344 And I set "scene.BIMWorkScheduleProperties.task_attributes.get('PredefinedType').enum_value" to "CONSTRUCTION"
345 And I press "bim.edit_task"
346 And I press "bim.enable_editing_task_time(task={task})"
347 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
348 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
349 And I press "bim.edit_task_time"
350 And I add a cube
351 And the object "Cube" is selected
352 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
353 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
354 And I press "bim.assign_class"
355 And the object "IfcWall/Cube" is selected
356 And I press "bim.assign_product(task={task})"
357 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
358 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
359 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
360 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
361 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
362 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
363 When I am on frame "1"
364 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "True"
365 And "scene.objects.get('IfcWall/Cube').hide_render" is "True"
366 When I am on frame "2"
367 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "False"
368 And "scene.objects.get('IfcWall/Cube').hide_render" is "False"
369 And "scene.objects.get('IfcWall/Cube').color[:]" is "[0.0, 1.0, 0.0, 1]"
370 When I am on frame "7"
371 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 1.0, 1.0, 1]"
372
373 Scenario: Animate the demolition of a wall
374 Given an empty IFC project
375 And I press "bim.add_work_schedule"
376 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
377 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
378 And I press "bim.add_summary_task(work_schedule={work_schedule})"
379 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
380 And I press "bim.enable_editing_task_attributes(task={task})"
381 And I set "scene.BIMWorkScheduleProperties.task_attributes.get('PredefinedType').enum_value" to "DEMOLITION"
382 And I press "bim.edit_task"
383 And I press "bim.enable_editing_task_time(task={task})"
384 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
385 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
386 And I press "bim.edit_task_time"
387 And I add a cube
388 And the object "Cube" is selected
389 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
390 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
391 And I press "bim.assign_class"
392 And the object "IfcWall/Cube" is selected
393 And I press "bim.assign_process(task={task}, related_object=0, related_object_type='PRODUCT')"
394 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
395 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
396 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
397 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
398 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
399 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
400 When I am on frame "1"
401 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "False"
402 And "scene.objects.get('IfcWall/Cube').hide_render" is "False"
403 And "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 1.0, 1.0, 1]"
404 When I am on frame "2"
405 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "False"
406 And "scene.objects.get('IfcWall/Cube').hide_render" is "False"
407 And "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 0.0, 0.0, 1]"
408 When I am on frame "7"
409 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "True"
410 And "scene.objects.get('IfcWall/Cube').hide_render" is "True"
411 And "scene.objects.get('IfcWall/Cube').color[:]" is "[0.0, 0.0, 0.0, 1]"
412
413 Scenario: Animate the operation of a wall
414 Given an empty IFC project
415 And I press "bim.add_work_schedule"
416 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
417 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
418 And I press "bim.add_summary_task(work_schedule={work_schedule})"
419 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
420 And I press "bim.enable_editing_task_attributes(task={task})"
421 And I set "scene.BIMWorkScheduleProperties.task_attributes.get('PredefinedType').enum_value" to "OPERATION"
422 And I press "bim.edit_task"
423 And I press "bim.enable_editing_task_time(task={task})"
424 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
425 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
426 And I press "bim.edit_task_time"
427 And I add a cube
428 And the object "Cube" is selected
429 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
430 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
431 And I press "bim.assign_class"
432 And the object "IfcWall/Cube" is selected
433 And I press "bim.assign_product(task={task}, relating_product=0)"
434 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
435 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
436 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
437 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
438 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
439 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
440 When I am on frame "1"
441 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 1.0, 1.0, 1]"
442 When I am on frame "2"
443 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[0.0, 0.0, 1.0, 1]"
444 When I am on frame "7"
445 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 1.0, 1.0, 1]"
446
447 Scenario: Animate the movement of a wall
448 Given an empty IFC project
449 And I press "bim.add_work_schedule"
450 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
451 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
452 And I press "bim.add_summary_task(work_schedule={work_schedule})"
453 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
454 And I press "bim.enable_editing_task_attributes(task={task})"
455 And I set "scene.BIMWorkScheduleProperties.task_attributes.get('PredefinedType').enum_value" to "MOVE"
456 And I press "bim.edit_task"
457 And I press "bim.enable_editing_task_time(task={task})"
458 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
459 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
460 And I press "bim.edit_task_time"
461 And I add a cube
462 And I rename the object "Cube" to "ToObject"
463 And the object "ToObject" is selected
464 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
465 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
466 And I press "bim.assign_class"
467 And the object "IfcWall/ToObject" is selected
468 And I press "bim.assign_product(task={task}, relating_product=0)"
469 When I add a cube
470 And I rename the object "Cube" to "FromObject"
471 And the object "FromObject" is selected
472 And I press "bim.assign_class"
473 And the object "IfcWall/FromObject" is selected
474 And I press "bim.assign_process(task={task}, related_object_type='PRODUCT', related_object=0)"
475 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
476 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
477 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
478 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
479 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
480 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
481 When I am on frame "1"
482 Then "scene.objects.get('IfcWall/FromObject').color[:]" is "[1.0, 1.0, 1.0, 1]"
483 And "scene.objects.get('IfcWall/FromObject').hide_viewport" is "False"
484 And "scene.objects.get('IfcWall/FromObject').hide_render" is "False"
485 And "scene.objects.get('IfcWall/ToObject').hide_viewport" is "True"
486 And "scene.objects.get('IfcWall/ToObject').hide_render" is "True"
487 When I am on frame "2"
488 Then "scene.objects.get('IfcWall/FromObject').color[:]" is "[1.0, 0.5, 0.0, 1]"
489 And "scene.objects.get('IfcWall/FromObject').hide_viewport" is "False"
490 And "scene.objects.get('IfcWall/FromObject').hide_render" is "False"
491 And "scene.objects.get('IfcWall/ToObject').color[:]" is "[1.0, 1.0, 0.0, 1]"
492 And "scene.objects.get('IfcWall/ToObject').hide_viewport" is "False"
493 And "scene.objects.get('IfcWall/ToObject').hide_render" is "False"
494 When I am on frame "7"
495 Then "scene.objects.get('IfcWall/FromObject').color[:]" is "[0.0, 0.0, 0.0, 1]"
496 Then "scene.objects.get('IfcWall/FromObject').hide_viewport" is "True"
497 Then "scene.objects.get('IfcWall/FromObject').hide_render" is "True"
498 And "scene.objects.get('IfcWall/ToObject').color[:]" is "[1.0, 1.0, 1.0, 1]"
499 And "scene.objects.get('IfcWall/ToObject').hide_viewport" is "False"
500 And "scene.objects.get('IfcWall/ToObject').hide_render" is "False"
501
502 Scenario: Animate the consumption of a wall
503 Given an empty IFC project
504 And I press "bim.add_work_schedule"
505 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
506 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
507 And I press "bim.add_summary_task(work_schedule={work_schedule})"
508 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
509 And I press "bim.enable_editing_task_time(task={task})"
510 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
511 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
512 And I press "bim.edit_task_time"
513 And I add a cube
514 And the object "Cube" is selected
515 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
516 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
517 And I press "bim.assign_class"
518 And the object "IfcWall/Cube" is selected
519 And I press "bim.assign_process(task={task}, related_object_type='PRODUCT', related_object=0)"
520 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
521 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
522 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
523 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
524 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
525 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
526 When I am on frame "1"
527 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 1.0, 1.0, 1]"
528 And "scene.objects.get('IfcWall/Cube').hide_viewport" is "False"
529 And "scene.objects.get('IfcWall/Cube').hide_render" is "False"
530 When I am on frame "2"
531 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[0.2, 0.2, 0.2, 1]"
532 And "scene.objects.get('IfcWall/Cube').hide_viewport" is "False"
533 And "scene.objects.get('IfcWall/Cube').hide_render" is "False"
534 When I am on frame "7"
535 Then "scene.objects.get('IfcWall/Cube').color[:]" is "[0.0, 0.0, 0.0, 1]"
536 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "True"
537 Then "scene.objects.get('IfcWall/Cube').hide_render" is "True"
538
539
540
541 Scenario: Clear Previous Animation
542 Given an empty IFC project
543 And I press "bim.add_work_schedule"
544 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
545 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
546 And I press "bim.add_summary_task(work_schedule={work_schedule})"
547 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
548 And I press "bim.enable_editing_task_attributes(task={task})"
549 And I set "scene.BIMWorkScheduleProperties.task_attributes.get('PredefinedType').enum_value" to "CONSTRUCTION"
550 And I press "bim.edit_task"
551 And I press "bim.enable_editing_task_time(task={task})"
552 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
553 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
554 And I press "bim.edit_task_time"
555 And I add a cube
556 And the object "Cube" is selected
557 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
558 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
559 And I press "bim.assign_class"
560 And the object "IfcWall/Cube" is selected
561 And I press "bim.assign_product(task={task})"
562 And I set "scene.BIMWorkScheduleProperties.visualisation_start" to "01/01/21"
563 And I set "scene.BIMWorkScheduleProperties.visualisation_finish" to "01/02/21"
564 And I set "scene.BIMWorkScheduleProperties.speed_types" to "FRAME_SPEED"
565 And I set "scene.BIMWorkScheduleProperties.speed_animation_frames" to "7"
566 And I set "scene.BIMWorkScheduleProperties.speed_real_duration" to "1 w"
567 And I press "bim.visualise_work_schedule_date_range(work_schedule={work_schedule})"
568 And I press "bim.clear_previous_animation"
569 When I am on frame "3"
570 Then "scene.objects.get('IfcWall/Cube').hide_viewport" is "False"
571 And "scene.objects.get('IfcWall/Cube').hide_render" is "False"
572 And "scene.objects.get('IfcWall/Cube').color[:]" is "[1.0, 1.0, 1.0, 1]"
573
574 Scenario: Generate Gantt Chart
575 Given an empty IFC project
576 And I press "bim.add_work_schedule"
577 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
578 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
579 And I press "bim.add_summary_task(work_schedule={work_schedule})"
580 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
581 And I press "bim.enable_editing_task_attributes(task={task})"
582 And I set "scene.BIMWorkScheduleProperties.task_attributes.get('PredefinedType').enum_value" to "CONSTRUCTION"
583 And I press "bim.edit_task"
584 And I press "bim.enable_editing_task_time(task={task})"
585 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
586 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
587 And I press "bim.edit_task_time"
588 And I press "bim.generate_gantt_chart(work_schedule={work_schedule})"
589 Then nothing happens
590
591 Scenario: Edit task with calendar
592 Given an empty IFC project
593 When I press "bim.add_work_calendar"
594 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
595 When I press "bim.add_work_schedule"
596 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
597 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
598 And I press "bim.add_summary_task(work_schedule={work_schedule})"
599 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
600 When I press "bim.add_task(task={task})"
601 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
602 When I press "bim.add_task(task={task})"
603 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
604 When I press "bim.add_task(task={task})"
605 And the variable "nested_task_three" is "IfcStore.get_file().by_type('IfcTask')[3].id()"
606 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
607 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="WorkingTimes")"
608 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="ExceptionTimes")"
609 And I press "bim.disable_editing_work_calendar"
610 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "1"
611 And I press "bim.enable_editing_task_sequence()"
612 And I press "bim.assign_successor(task={nested_task_two})"
613 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "3"
614 And I press "bim.assign_predecessor(task={nested_task_two})"
615 And I press "bim.disable_editing_task"
616 And I press "bim.enable_editing_task_time(task={nested_task_three})"
617 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
618 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
619 And I press "bim.edit_task_time"
620 And I press "bim.enable_editing_task_calendar(task={task})"
621 And I press "bim.edit_task_calendar(work_calendar={work_calendar}, task={task})"
622 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "1"
623 And I press "bim.enable_editing_task_sequence()"
624 And I press "bim.disable_editing_task()"
625 Then nothing happens
626
627
628 Scenario: Assign task calendar with Working Time
629 Given an empty IFC project
630 When I press "bim.add_work_calendar"
631 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
632 When I press "bim.add_work_schedule"
633 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
634 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
635 And I press "bim.add_summary_task(work_schedule={work_schedule})"
636 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
637 When I press "bim.add_task(task={task})"
638 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
639 When I press "bim.add_task(task={task})"
640 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
641 When I press "bim.add_task(task={task})"
642 And the variable "nested_task_three" is "IfcStore.get_file().by_type('IfcTask')[3].id()"
643 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
644 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="WorkingTimes")"
645 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="ExceptionTimes")"
646 And I press "bim.disable_editing_work_calendar"
647 And I press "bim.enable_editing_task_sequence()"
648 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "1"
649 And I press "bim.assign_successor(task={nested_task_two})"
650 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "3"
651 And I press "bim.assign_predecessor(task={nested_task_two})"
652 And I press "bim.disable_editing_task"
653 And I press "bim.enable_editing_task_calendar(task={task})"
654 And I press "bim.edit_task_calendar(work_calendar={work_calendar}, task={nested_task_three})"
655 And I press "bim.disable_editing_task()"
656 And I press "bim.enable_editing_task_time(task={nested_task_three})"
657 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
658 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
659 # And I press "bim.edit_task_time"
660 Then nothing happens
661
662 Scenario: Assign task calendar with no working time
663 Given an empty IFC project
664 When I press "bim.add_work_calendar"
665 And the variable "work_calendar" is "IfcStore.get_file().by_type('IfcWorkCalendar')[0].id()"
666 When I press "bim.add_work_schedule"
667 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
668 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
669 And I press "bim.add_summary_task(work_schedule={work_schedule})"
670 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
671 When I press "bim.add_task(task={task})"
672 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
673 When I press "bim.add_task(task={task})"
674 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
675 When I press "bim.add_task(task={task})"
676 And the variable "nested_task_three" is "IfcStore.get_file().by_type('IfcTask')[3].id()"
677 And I press "bim.enable_editing_task_sequence()"
678 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "1"
679 And I press "bim.assign_successor(task={nested_task_two})"
680 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "3"
681 And I press "bim.assign_predecessor(task={nested_task_two})"
682 And I press "bim.disable_editing_task"
683 And I press "bim.enable_editing_task_calendar(task={task})"
684 And I press "bim.edit_task_calendar(work_calendar={work_calendar}, task={nested_task_three})"
685 And I press "bim.disable_editing_task()"
686 When I press "bim.enable_editing_work_calendar_times(work_calendar={work_calendar})"
687 When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="WorkingTimes")"
688 And the variable "work_time" is "IfcStore.get_file().by_type('IfcWorkTime')[0].id()"
689 When I press "bim.enable_editing_work_time(work_time={work_time})"
690 And I set "scene.BIMWorkCalendarProperties.work_time_attributes.get('Start').string_value" to "01-08-2021"
691 And I set "scene.BIMWorkCalendarProperties.work_time_attributes.get('Finish').string_value" to "01-08-2022"
692 When I press "bim.assign_recurrence_pattern(work_time={work_time}, recurrence_type='DAILY')"
693 And the variable "recurrence_pattern" is "IfcStore.get_file().by_type('IfcRecurrencePattern')[0].id()"
694 And I set "scene.BIMWorkCalendarProperties.start_time" to "9AM"
695 And I set "scene.BIMWorkCalendarProperties.end_time" to "1PM"
696 When I press "bim.add_time_period(recurrence_pattern={recurrence_pattern})"
697 And I press "bim.edit_work_time"
698 # When I press "bim.add_work_time(work_calendar={work_calendar}, time_type="ExceptionTimes")"
699 And I press "bim.disable_editing_work_calendar"
700 And I press "bim.enable_editing_task_time(task={nested_task_three})"
701 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleStart').string_value" to "2021-01-02"
702 And I set "scene.BIMWorkScheduleProperties.task_time_attributes.get('ScheduleFinish').string_value" to "2021-01-06"
703 And I press "bim.edit_task_time"
704 Then nothing happens
705
706 Scenario: Contract Task
707 Given an empty IFC project
708 When I press "bim.add_work_schedule"
709 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
710 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
711 And I press "bim.add_summary_task(work_schedule={work_schedule})"
712 And the variable "summary_task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
713 When I press "bim.add_task(task={summary_task})"
714 And I press "bim.contract_task(task={summary_task})"
715 Then nothing happens
716
717 Scenario: Expand Task
718 Given an empty IFC project
719 When I press "bim.add_work_schedule"
720 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
721 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
722 And I press "bim.add_summary_task(work_schedule={work_schedule})"
723 And the variable "summary_task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
724 When I press "bim.add_task(task={summary_task})"
725 And I press "bim.contract_task(task={summary_task})"
726 And I press "bim.expand_task(task={summary_task})"
727 Then nothing happens
728
729 Scenario: Contract All Tasks
730 Given an empty IFC project
731 When I press "bim.add_work_schedule"
732 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
733 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
734 And I press "bim.add_summary_task(work_schedule={work_schedule})"
735 And the variable "summary_task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
736 When I press "bim.add_task(task={summary_task})"
737 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[-1].id()"
738 When I press "bim.add_task(task={summary_task})"
739 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[-1].id()"
740 When I press "bim.contract_all_tasks()"
741 Then nothing happens
742
743 Scenario: Expand All Tasks
744 Given an empty IFC project
745 When I press "bim.add_work_schedule"
746 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
747 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
748 And I press "bim.add_summary_task(work_schedule={work_schedule})"
749 And the variable "summary_task" is "IfcStore.get_file().by_type('IfcTask')[-1].id()"
750 When I press "bim.add_task(task={summary_task})"
751 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[-1].id()"
752 When I press "bim.add_task(task={summary_task})"
753 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[-1].id()"
754 And I press "bim.contract_all_tasks()"
755 When I press "bim.expand_all_tasks()"
756 Then nothing happens
757
758 Scenario: Assign Product Output
759 Given an empty IFC project
760 And I press "bim.add_work_schedule"
761 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
762 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
763 And I press "bim.add_summary_task(work_schedule={work_schedule})"
764 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
765 And I add a cube
766 And the object "Cube" is selected
767 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
768 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
769 And I press "bim.assign_class(ifc_class='IfcWall', predefined_type='SOLIDWALL')"
770 And the object "IfcWall/Cube" is selected
771 And I press "bim.assign_product(task={task})"
772 Then nothing happens
773
774 Scenario: Assign Product Input
775 Given an empty IFC project
776 And I press "bim.add_work_schedule"
777 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
778 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
779 And I press "bim.add_summary_task(work_schedule={work_schedule})"
780 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
781 And I add a cube
782 And the object "Cube" is selected
783 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
784 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
785 And I press "bim.assign_class(ifc_class='IfcWall', predefined_type='SOLIDWALL')"
786 And the object "IfcWall/Cube" is selected
787 And I press "bim.assign_process(task={task},related_object=0, related_object_type='PRODUCT')"
788 Then nothing happens
789
790 Scenario: Select Assigned Outputs
791 Given an empty IFC project
792 And I press "bim.add_work_schedule"
793 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
794 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
795 And I press "bim.add_summary_task(work_schedule={work_schedule})"
796 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
797 And I add a cube
798 And the object "Cube" is selected
799 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
800 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
801 And I press "bim.assign_class()"
802 And I press "bim.assign_product(task={task})"
803 When I press "bim.select_task_related_products(task={task})"
804 Then nothing happens
805
806 Scenario: Select Assigned Inputs
807 Given an empty IFC project
808 And I press "bim.add_work_schedule"
809 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
810 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
811 And I press "bim.add_summary_task(work_schedule={work_schedule})"
812 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
813 And I add a cube
814 And the object "Cube" is selected
815 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
816 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"
817 And I press "bim.assign_class()"
818 And the object "IfcWall/Cube" is selected
819 And I press "bim.assign_process(task={task}, related_object_type='PRODUCT')"
820 When I press "bim.select_task_related_products(task={task})"
821 Then nothing happens
822
823 Scenario: Duplicate Task
824 Given an empty IFC project
825 And I press "bim.add_work_schedule"
826 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
827 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
828 When I press "bim.add_summary_task(work_schedule={work_schedule})"
829 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
830 When I press "bim.add_task(task={task})"
831 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
832 When I press "bim.add_task(task={task})"
833 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
834 And I press "bim.enable_editing_task_attributes(task={nested_task_one})"
835 And I press "bim.assign_successor(task={nested_task_two})"
836 When I press "bim.duplicate_task(task={task})"
837 Then nothing happens
838
839 Scenario: Duplicate Task and edit sequence Relationship
840 Given an empty IFC project
841 And I press "bim.add_work_schedule"
842 And the variable "work_schedule" is "IfcStore.get_file().by_type('IfcWorkSchedule')[0].id()"
843 And I press "bim.enable_editing_work_schedule_tasks(work_schedule={work_schedule})"
844 When I press "bim.add_summary_task(work_schedule={work_schedule})"
845 And the variable "task" is "IfcStore.get_file().by_type('IfcTask')[0].id()"
846 When I press "bim.add_task(task={task})"
847 And the variable "nested_task_one" is "IfcStore.get_file().by_type('IfcTask')[1].id()"
848 When I press "bim.add_task(task={task})"
849 And the variable "nested_task_two" is "IfcStore.get_file().by_type('IfcTask')[2].id()"
850 And I press "bim.enable_editing_task_attributes(task={nested_task_one})"
851 And I press "bim.assign_successor(task={nested_task_two})"
852 And I press "bim.duplicate_task(task={task})"
853 When I press "bim.enable_editing_task_sequence()"
854 And I set "scene.BIMWorkScheduleProperties.active_task_index" to "1"
855 Then nothing happens
856
857 Scenario: Add Animation Camera
858 Given an empty IFC project
859 And I add a cube
860 And the object "Cube" is selected
861 And I set "scene.BIMRootProperties.ifc_product" to "IfcElement"
862 And I set "scene.BIMRootProperties.ifc_class" to "IfcWall"