| 1 |
% Copyright 2019 by Till Tantau |
| 2 |
% |
| 3 |
% This file may be distributed and/or modified |
| 4 |
% |
| 5 |
% 1. under the LaTeX Project Public License and/or |
| 6 |
% 2. under the GNU Free Documentation License. |
| 7 |
% |
| 8 |
% See the file doc/generic/pgf/licenses/LICENSE for more details. |
| 9 |
|
| 10 |
|
| 11 |
\section{Chains} |
| 12 |
\label{section-chains} |
| 13 |
|
| 14 |
\begin{tikzlibrary}{chains} |
| 15 |
This library defines options for creating chains. |
| 16 |
\end{tikzlibrary} |
| 17 |
|
| 18 |
|
| 19 |
\subsection{Overview} |
| 20 |
|
| 21 |
\emph{Chains} are sequences of nodes that are -- typically -- arranged in a row |
| 22 |
or a column and that are -- typically -- connected by edges. More generally, |
| 23 |
they can be used to position nodes of a branching network in a systematic |
| 24 |
manner. For the positioning of nodes in rows and columns you can also use |
| 25 |
matrices, see Section~\ref{section-matrices}, but chains can also be used to |
| 26 |
describe the connections between nodes that have already been connected using, |
| 27 |
say, matrices. Thus, it often makes sense to use matrices for the positioning |
| 28 |
of elements and chains to describe the connections. |
| 29 |
|
| 30 |
|
| 31 |
\subsection{Starting and Continuing a Chain} |
| 32 |
|
| 33 |
Typically, you construct one chain at a time, but it is permissible to |
| 34 |
construct multiple chains simultaneously. In this case, the chains must be |
| 35 |
named differently and you must specify for each node which chain it belongs to. |
| 36 |
|
| 37 |
The first step toward creating a chain is to use the |start chain| option. |
| 38 |
|
| 39 |
\begin{key}{/tikz/start chain=\opt{\meta{chain name}}\opt{\meta{direction}}} |
| 40 |
This key should, but need not, be given as an option to a scope enclosing |
| 41 |
all nodes of the chain. Typically, this will be a |scope| or the whole |
| 42 |
|tikzpicture|, but it might just be a path on which all nodes of the chain |
| 43 |
are found. If no \meta{chain name} is given, the default value |chain| will |
| 44 |
be used instead. |
| 45 |
|
| 46 |
The key starts a chain named \meta{chain name} and makes it \emph{active}, |
| 47 |
which means that it is currently being constructed. The |start chain| can |
| 48 |
be issued only once to activate a chain, inside a scope in which a chain is |
| 49 |
active you cannot use this option once more (for the same chain name). The |
| 50 |
chain stops being active at the end of the scope in which the |start chain| |
| 51 |
command was given. |
| 52 |
|
| 53 |
Although chains are only locally active (that is, active inside the scope |
| 54 |
the |start chain| command was issued), the information concerning the |
| 55 |
chains is stored globally and it is possible to \emph{continue} a chain |
| 56 |
after a scope has ended. For this, the |continue chain| option can be used, |
| 57 |
which allows you to reactivate an existing chain in another scope. |
| 58 |
|
| 59 |
The \meta{direction} is used to determine the placement rule for nodes on |
| 60 |
the chain. If it is omitted, the current value of the following key is |
| 61 |
used: |
| 62 |
% |
| 63 |
\begin{key}{/tikz/chain default direction=\meta{direction} (initially going right)} |
| 64 |
This \meta{direction} is used in a |chain| option, if no other |
| 65 |
\meta{direction} is specified. |
| 66 |
\end{key} |
| 67 |
|
| 68 |
The \meta{direction} can have two different forms: |
| 69 |
\declare{|going |\meta{options}} or \declare{|placed |\meta{options}}. The |
| 70 |
effect of these rules will be explained in the description of the |
| 71 |
|on chain| option. Right now, just remember that the \meta{direction} you |
| 72 |
provide with the |chain| option applies to the whole chain. |
| 73 |
|
| 74 |
Other than this, this key has no further effect. In particular, to place |
| 75 |
nodes on the chain, you must use the |on chain| option, described next. |
| 76 |
% |
| 77 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 78 |
\begin{tikzpicture}[start chain] |
| 79 |
% The chain is called just "chain" |
| 80 |
\node [on chain] {A}; |
| 81 |
\node [on chain] {B}; |
| 82 |
\node [on chain] {C}; |
| 83 |
\end{tikzpicture} |
| 84 |
\end{codeexample} |
| 85 |
|
| 86 |
\begin{codeexample}[preamble={\usetikzlibrary{chains,scopes}}] |
| 87 |
\begin{tikzpicture} |
| 88 |
% Same as above, using the scope shorthand |
| 89 |
{ [start chain] |
| 90 |
\node [on chain] {A}; |
| 91 |
\node [on chain] {B}; |
| 92 |
\node [on chain] {C}; |
| 93 |
} |
| 94 |
\end{tikzpicture} |
| 95 |
\end{codeexample} |
| 96 |
|
| 97 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 98 |
\begin{tikzpicture}[start chain=1 going right, |
| 99 |
start chain=2 going below, |
| 100 |
node distance=5mm, |
| 101 |
every node/.style=draw] |
| 102 |
\node [on chain=1] {A}; |
| 103 |
\node [on chain=1] {B}; |
| 104 |
\node [on chain=1] {C}; |
| 105 |
|
| 106 |
\node [on chain=2] at (0.5,-.5) {0}; |
| 107 |
\node [on chain=2] {1}; |
| 108 |
\node [on chain=2] {2}; |
| 109 |
|
| 110 |
\node [on chain=1] {D}; |
| 111 |
\end{tikzpicture} |
| 112 |
\end{codeexample} |
| 113 |
% |
| 114 |
\end{key} |
| 115 |
|
| 116 |
\begin{key}{/tikz/continue chain=\opt{\meta{chain name}}\opt{\meta{direction}}} |
| 117 |
This option allows you to (re)activate an existing chain and to possibly |
| 118 |
change the default direction. If the |chain name| is missing, the name of |
| 119 |
the innermost activated chain is used. If no chain is activated, |chain| is |
| 120 |
used. |
| 121 |
|
| 122 |
Let us have a look at the two different applications of this option. The |
| 123 |
first is to change the direction of a chain as it is being constructed. For |
| 124 |
this, just give this option somewhere inside the scope of the chain. |
| 125 |
% |
| 126 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 127 |
\begin{tikzpicture}[start chain=going right,node distance=5mm] |
| 128 |
\node [draw,on chain] {Hello}; |
| 129 |
\node [draw,on chain] {World}; |
| 130 |
\node [draw,continue chain=going below,on chain] {,}; |
| 131 |
\node [draw,on chain] {this}; |
| 132 |
\node [draw,on chain] {is}; |
| 133 |
\end{tikzpicture} |
| 134 |
\end{codeexample} |
| 135 |
|
| 136 |
The second application is to reactivate a chain after it ``has already been |
| 137 |
closed down''. |
| 138 |
% |
| 139 |
\begin{codeexample}[preamble={\usetikzlibrary{chains,scopes}}] |
| 140 |
\begin{tikzpicture}[node distance=5mm, |
| 141 |
every node/.style=draw] |
| 142 |
{ [start chain=1] |
| 143 |
\node [on chain] {A}; |
| 144 |
\node [on chain] {B}; |
| 145 |
\node [on chain] {C}; |
| 146 |
} |
| 147 |
|
| 148 |
{ [start chain=2 going below] |
| 149 |
\node [on chain=2] at (0.5,-.5) {0}; |
| 150 |
\node [on chain=2] {1}; |
| 151 |
\node [on chain=2] {2}; |
| 152 |
} |
| 153 |
|
| 154 |
{ [continue chain=1] |
| 155 |
\node [on chain] {D}; |
| 156 |
} |
| 157 |
\end{tikzpicture} |
| 158 |
\end{codeexample} |
| 159 |
% |
| 160 |
\end{key} |
| 161 |
|
| 162 |
|
| 163 |
\subsection{Nodes on a Chain} |
| 164 |
|
| 165 |
\begin{key}{/tikz/on chain=\opt{\meta{chain name}}\opt{\meta{direction}}} |
| 166 |
This key should be given as an option to a node. When the option is used, |
| 167 |
the \meta{chain name} must be the name of a chain that has been started |
| 168 |
using the |start chain| option. If \meta{chain name} is the empty string, |
| 169 |
the current value of the innermost activated chain is used. If this option |
| 170 |
is used several times for a node, only the last invocation ``wins''. (To |
| 171 |
place a node on several chains, use the |\chainin| command repeatedly.) |
| 172 |
|
| 173 |
The \meta{direction} part is optional. If present, it sets the direction |
| 174 |
used for this node, otherwise the \meta{direction} that was given to the |
| 175 |
original |start chain| option is used (or of the last |continue chain| |
| 176 |
option, which allows you to change this default). |
| 177 |
|
| 178 |
The effects of this option are the following: |
| 179 |
% |
| 180 |
\begin{enumerate} |
| 181 |
\item An internal counter (there is one local counter for each chain) |
| 182 |
is increased. This counter reflects the current number of the node |
| 183 |
in the chain, where the first node is node 1, the second is node 2, |
| 184 |
and so on. |
| 185 |
|
| 186 |
The value of this internal counter is globally stored in the macro |
| 187 |
\declare{|\tikzchaincount|}. |
| 188 |
\item If the node does not yet have a name, (having been given using |
| 189 |
the |name| option or the name-syntax), the name of the node is set |
| 190 |
to \meta{chain name}|-|\meta{value of the internal chain counter}. |
| 191 |
For instance, if the chain is called |nums|, the first node would |
| 192 |
be named |nums-1|, the second |nums-2|, and so on. For the default |
| 193 |
chain name |chain|, the first node is named |chain-1|, the second |
| 194 |
|chain-2|, and so on. |
| 195 |
\item Independently of whether the name has been provided automatically |
| 196 |
or via the |name| option, the name of the node is globally stored |
| 197 |
in the macro \declare{|\tikzchaincurrent|}. |
| 198 |
\item Except for the first node, the macro |
| 199 |
\declare{|\tikzchainprevious|} is now globally set to the name of |
| 200 |
the node of the previous node on the chain. For the first node of |
| 201 |
the chain, this macro is globally set to the empty string. |
| 202 |
\item Except possibly for the first node of the chain, the placement |
| 203 |
rule is now executed. The placement rule is just a \tikzname\ |
| 204 |
option that is applied automatically to each node on the chain. |
| 205 |
Depending on the form of the \meta{direction} parameter (either the |
| 206 |
locally given one or the one given to the |start chain| option), |
| 207 |
different things happen. |
| 208 |
|
| 209 |
First, it makes a difference whether the \meta{direction} starts |
| 210 |
with |going| or with |placed|. The difference is that in the first |
| 211 |
case, the placement rule is not applied to the first node of the |
| 212 |
chain, while in the second case the placement rule is applied also |
| 213 |
to this first node. The idea is that a |going|-direction indicates |
| 214 |
that we are ``going somewhere relative to the previous node'' |
| 215 |
whereas a |placed| indicates that we are ``placing nodes according |
| 216 |
to their number''. |
| 217 |
|
| 218 |
Independently of which form is used, the \meta{text} inside |
| 219 |
\meta{direction} that follows |going| or |placed| (separated by a |
| 220 |
compulsory space) can have two different effects: |
| 221 |
% |
| 222 |
\begin{enumerate} |
| 223 |
\item If it contains an equal sign, then this \meta{text} is |
| 224 |
used as the placement rule, that is, it is simply executed. |
| 225 |
\item If it does not contain an equal sign, then |
| 226 |
\meta{text}|=of \tikzchainprevious| is used as the |
| 227 |
placement rule. |
| 228 |
\end{enumerate} |
| 229 |
|
| 230 |
Note that in the first case, inside the \meta{text} you have access |
| 231 |
to |\tikzchainprevious| and |\tikzchaincount| for doing your |
| 232 |
positioning calculations. |
| 233 |
% |
| 234 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 235 |
\begin{tikzpicture}[start chain=circle placed {at=(\tikzchaincount*30:1.5)}] |
| 236 |
\foreach \i in {1,...,10} |
| 237 |
\node [on chain] {\i}; |
| 238 |
|
| 239 |
\draw (circle-1) -- (circle-10); |
| 240 |
\end{tikzpicture} |
| 241 |
\end{codeexample} |
| 242 |
\item The following style is executed: |
| 243 |
% |
| 244 |
\begin{stylekey}{/tikz/every on chain} |
| 245 |
This key is executed for every node on a chain, including the |
| 246 |
first one. |
| 247 |
\end{stylekey} |
| 248 |
\end{enumerate} |
| 249 |
|
| 250 |
Recall that the standard placement rule has a form like |
| 251 |
|right=of (\tikzchainprevious)|. This means that each new node is placed to |
| 252 |
the right of the previous one, spaced by the current value of |
| 253 |
|node distance|. |
| 254 |
% |
| 255 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 256 |
\begin{tikzpicture}[start chain,node distance=5mm] |
| 257 |
\node [draw,on chain] {}; |
| 258 |
\node [draw,on chain] {Hallo}; |
| 259 |
\node [draw,on chain] {Welt}; |
| 260 |
\end{tikzpicture} |
| 261 |
\end{codeexample} |
| 262 |
|
| 263 |
The optional \meta{direction} allows us to temporarily change the direction |
| 264 |
in the middle of a chain: |
| 265 |
% |
| 266 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 267 |
\begin{tikzpicture}[start chain,node distance=5mm] |
| 268 |
\node [draw,on chain] {Hello}; |
| 269 |
\node [draw,on chain] {World}; |
| 270 |
\node [draw,on chain=going below] {,}; |
| 271 |
\node [draw,on chain] {this}; |
| 272 |
\node [draw,on chain] {is}; |
| 273 |
\end{tikzpicture} |
| 274 |
\end{codeexample} |
| 275 |
|
| 276 |
You can also use more complicated computations in the \meta{direction}: |
| 277 |
% |
| 278 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 279 |
\begin{tikzpicture}[start chain=going {at=(\tikzchainprevious),shift=(30:1)}] |
| 280 |
\draw [help lines] (0,0) grid (3,2); |
| 281 |
\node [draw,on chain] {1}; |
| 282 |
\node [draw,on chain] {Hello}; |
| 283 |
\node [draw,on chain] {World}; |
| 284 |
\node [draw,on chain] {.}; |
| 285 |
\end{tikzpicture} |
| 286 |
\end{codeexample} |
| 287 |
% |
| 288 |
\end{key} |
| 289 |
|
| 290 |
For each chain, two special ``pseudo nodes'' are created. |
| 291 |
|
| 292 |
\begin{predefinednode}{\meta{chain name}-begin} |
| 293 |
This node is the same as the first node on the chain. It is only defined |
| 294 |
after a first node has been defined. |
| 295 |
\end{predefinednode} |
| 296 |
|
| 297 |
\begin{predefinednode}{\meta{chain name}-end} |
| 298 |
This node is the same as the (currently) last node on the chain. As the |
| 299 |
chain is extended, this node changes. |
| 300 |
\end{predefinednode} |
| 301 |
|
| 302 |
The |on chain| option can also be used, in conjunction with |late options|, to |
| 303 |
add an already existing node to a chain. The following command, which is only |
| 304 |
defined inside scopes where a |start chain| option is present, simplifies this |
| 305 |
process. |
| 306 |
|
| 307 |
\begin{command}{\chainin |(|\meta{existing name}|)| \opt{\oarg{options}}} |
| 308 |
This command makes it easy to add a node to chain that has already been |
| 309 |
constructed. This node may even be part of a another chain. |
| 310 |
|
| 311 |
When you say |\chainin (some node);|, the node |some node| must already |
| 312 |
exist. It will then be made part of the current chain. This does not mean |
| 313 |
that the node can be changed (it is already constructed, after all), but |
| 314 |
the |join| option can be used to join |some node| to the previous last node |
| 315 |
on the chain and subsequent nodes will be placed relative to |some node|. |
| 316 |
|
| 317 |
It is permissible to give the |on chain| option inside the \meta{options} |
| 318 |
in order to specify on which chain the node should be put. |
| 319 |
|
| 320 |
This command is just a shortcut for |
| 321 |
% |
| 322 |
\begin{quote} |
| 323 |
|\path (|\meta{existing name}|) [late options={on chain,every chain in,|\meta{options}|}]| |
| 324 |
\end{quote} |
| 325 |
% |
| 326 |
In particular, it is possible to continue to path after a |\chainin| |
| 327 |
command, though that does not seem very useful. |
| 328 |
% |
| 329 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 330 |
\begin{tikzpicture}[node distance=5mm, |
| 331 |
every node/.style=draw,every join/.style=->] |
| 332 |
\draw [help lines] (0,0) grid (3,2); |
| 333 |
|
| 334 |
\node[red] (existing) at (0,2) {existing}; |
| 335 |
|
| 336 |
\begin{scope}[start chain] |
| 337 |
\node [draw,on chain,join] {Hello}; |
| 338 |
\node [draw,on chain,join] {World}; |
| 339 |
\chainin (existing) [join]; |
| 340 |
\node [draw,on chain,join] {this}; |
| 341 |
\node [draw,on chain,join] {is}; |
| 342 |
\end{scope} |
| 343 |
\end{tikzpicture} |
| 344 |
\end{codeexample} |
| 345 |
|
| 346 |
Here is an example where nodes are positioned using a matrix and then |
| 347 |
connected using a chain |
| 348 |
% |
| 349 |
{\catcode`\|=12 |
| 350 |
\begin{codeexample}[preamble={\usetikzlibrary{chains,matrix,scopes,shapes.geometric}}] |
| 351 |
\begin{tikzpicture}[every node/.style=draw] |
| 352 |
\matrix [matrix of nodes,column sep=5mm,row sep=5mm] |
| 353 |
{ |
| 354 |
|(a)| World & |(b) [circle]| peace \\ |
| 355 |
|(c)| be & |(d) [isosceles triangle]| would \\ |
| 356 |
|(e) [ellipse]| great & |(f)| ! \\ |
| 357 |
}; |
| 358 |
|
| 359 |
% (the `scopes' library needs to be loaded to make the following work) |
| 360 |
{ [start chain,every on chain/.style={join=by ->}] |
| 361 |
\chainin (a); |
| 362 |
\chainin (b); |
| 363 |
\chainin (d); |
| 364 |
\chainin (c); |
| 365 |
\chainin (e); |
| 366 |
\chainin (f); |
| 367 |
} |
| 368 |
\end{tikzpicture} |
| 369 |
\end{codeexample} |
| 370 |
} |
| 371 |
% |
| 372 |
\end{command} |
| 373 |
|
| 374 |
|
| 375 |
\subsection{Joining Nodes on a Chain} |
| 376 |
|
| 377 |
\begin{key}{/tikz/join=\opt{|with |\meta{with} }\opt{|by |\meta{options}}} |
| 378 |
When this key is given to any node on a chain (except possibly for the |
| 379 |
first node), an |edge| command is added after the node. The |with| part |
| 380 |
specifies which node should be used for the start point of the edge; if the |
| 381 |
|with| part is omitted, the |\tikzchainprevious| is used. This |edge| |
| 382 |
command gets the \meta{options} as parameter and the current node as its |
| 383 |
target. If there is no previous node and no |with| is given, no |edge| |
| 384 |
command gets executed. |
| 385 |
% |
| 386 |
\begin{stylekey}{/tikz/every join} |
| 387 |
This style is executed each time this command is used. |
| 388 |
\end{stylekey} |
| 389 |
|
| 390 |
Note that it makes sense to call this option several times for a node, in |
| 391 |
order to connect it to several nodes. This is especially useful for joining |
| 392 |
in branches, see the next section. |
| 393 |
% |
| 394 |
\begin{codeexample}[preamble={\usetikzlibrary{chains}}] |
| 395 |
\begin{tikzpicture}[start chain,node distance=5mm, |
| 396 |
every join/.style={->,red}] |
| 397 |
\node [draw,on chain,join] {}; |
| 398 |
\node [draw,on chain,join] {Hallo}; |
| 399 |
\node [draw,on chain,join] {Welt}; |
| 400 |
\node [draw,on chain=going below, |
| 401 |
join,join=with chain-1 by {blue,<-}] {foo}; |
| 402 |
\end{tikzpicture} |
| 403 |
\end{codeexample} |
| 404 |
% |
| 405 |
\end{key} |
| 406 |
|
| 407 |
|
| 408 |
\subsection{Branches} |
| 409 |
|
| 410 |
A \emph{branch} is a chain that (typically only temporarily) extends an |
| 411 |
existing chain. The idea is the following: Suppose we are constructing a chain |
| 412 |
and at some node |x| there is a fork. In this case, one (or even more) branches |
| 413 |
starts at this fork. For each branch a chain is created, but the first node on |
| 414 |
this chain should be~|x|. For this, it is useful to use |\chainin| on the node |
| 415 |
|x| to make it part of the different branch chains and to name the branch |
| 416 |
chains in some way that reflects the name of the main chain. |
| 417 |
|
| 418 |
The |start branch| option provides a shorthand for doing exactly what was just |
| 419 |
described. |
| 420 |
|
| 421 |
\begin{key}{/tikz/start branch=\meta{branch name}\opt{\meta{direction}}} |
| 422 |
This key is used in the same manner as the |start chain| command, however, |
| 423 |
the effect is slightly different: |
| 424 |
% |
| 425 |
\begin{itemize} |
| 426 |
\item This option may only be used if some chain is already active and |
| 427 |
there is a (last) node on this chain. Let us call this node the |
| 428 |
\meta{fork node}. |
| 429 |
\item The chain is not just called \meta{branch name}, but |
| 430 |
\meta{current chain}|/|\meta{branch name}. For instance, if the |
| 431 |
\meta{fork node} is part of the chain called |trunk| and the |
| 432 |
\meta{branch name} is set to |left|, the complete chain name of the |
| 433 |
branch is |trunk/left|. The \meta{branch name} must be given, there |
| 434 |
is no default value. |
| 435 |
\item The \meta{fork node} is automatically ``chained into'' the branch |
| 436 |
chain as its first node. Thus, for the first node on the branch |
| 437 |
that you provide, the |join| option will cause it to be connected |
| 438 |
to the fork node. |
| 439 |
\end{itemize} |
| 440 |
% |
| 441 |
\begin{codeexample}[preamble={\usetikzlibrary{chains,scopes}}] |
| 442 |
\begin{tikzpicture}[every on chain/.style=join,every join/.style=->, |
| 443 |
node distance=2mm and 1cm] |
| 444 |
{ [start chain=trunk] |
| 445 |
\node [on chain] {A}; |
| 446 |
\node [on chain] {B}; |
| 447 |
|
| 448 |
{ [start branch=numbers going below] |
| 449 |
\node [on chain] {1}; |
| 450 |
\node [on chain] {2}; |
| 451 |
\node [on chain] {3}; |
| 452 |
} |
| 453 |
{ [start branch=greek going above] |
| 454 |
\node [on chain] {$\alpha$}; |
| 455 |
\node [on chain] {$\beta$}; |
| 456 |
\node [on chain] {$\gamma$}; |
| 457 |
} |
| 458 |
|
| 459 |
\node [on chain,join=with trunk/numbers-end,join=with trunk/greek-end] {C}; |
| 460 |
{ [start branch=symbols going below] |
| 461 |
\node [on chain] {$\star$}; |
| 462 |
\node [on chain] {$\circ$}; |
| 463 |
\node [on chain] {$\int$}; |
| 464 |
} |
| 465 |
} |
| 466 |
\end{tikzpicture} |
| 467 |
\end{codeexample} |
| 468 |
% |
| 469 |
\end{key} |
| 470 |
|
| 471 |
\begin{key}{/tikz/continue branch=\meta{branch name}\opt{\meta{direction}}} |
| 472 |
This option works like the |continue chain| option, only \meta{current |
| 473 |
chain}|/|\meta{branch name} is used as the chain name, rather than just |
| 474 |
\meta{branch name}. |
| 475 |
% |
| 476 |
\begin{codeexample}[preamble={\usetikzlibrary{chains,scopes}}] |
| 477 |
\begin{tikzpicture}[every on chain/.style=join,every join/.style=->, |
| 478 |
node distance=2mm and 1cm] |
| 479 |
{ [start chain=trunk] |
| 480 |
\node [on chain] {A}; |
| 481 |
\node [on chain] {B}; |
| 482 |
{ [start branch=numbers going below] } % just a declaration, |
| 483 |
{ [start branch=greek going above] } % we will come back later |
| 484 |
\node [on chain] {C}; |
| 485 |
|
| 486 |
% Now come the branches... |
| 487 |
{ [continue branch=numbers] |
| 488 |
\node [on chain] {1}; |
| 489 |
\node [on chain] {2}; |
| 490 |
} |
| 491 |
{ [continue branch=greek] |
| 492 |
\node [on chain] {$\alpha$}; |
| 493 |
\node [on chain] {$\beta$}; |
| 494 |
} |
| 495 |
} |
| 496 |
\end{tikzpicture} |
| 497 |
\end{codeexample} |
| 498 |
% |
| 499 |
\end{key} |