Release schedule |
| 2 |
---------------- |
| 3 |
|
| 4 |
The util-linux package uses the <major>.<minor>.<maintenance> version |
| 5 |
numbering scheme. Since the major version is pretty much fixed, any |
| 6 |
release means an increment of the minor number. The minor version is |
| 7 |
incremented roughly twice per year. The easiest way to estimate when |
| 8 |
the next version will appear, is to look at the time stamp of the last |
| 9 |
release. |
| 10 |
|
| 11 |
Before each release there are a few release candidates, which will be |
| 12 |
collectively tested. During the test period changes to the code base |
| 13 |
are restricted. Usually there are two release candidates. |
| 14 |
|
| 15 |
what length what will be accepted into upstream |
| 16 |
--------------------------------------------------------- |
| 17 |
rc1 1-2 weeks bug fixes only |
| 18 |
rc2 1-2 weeks translations, fatal/trivial bug fixes |
| 19 |
|
| 20 |
The period between a release and the next release candidate can be considered |
| 21 |
as the merge window. |
| 22 |
|
| 23 |
The release tarball is generated by "make distcheck" command. |
| 24 |
|
| 25 |
Release criteria |
| 26 |
---------------- |
| 27 |
|
| 28 |
For all releases it is required that: |
| 29 |
|
| 30 |
- make checkincludes passes |
| 31 |
- make checkconfig passes |
| 32 |
- make distcheck passes |
| 33 |
- cd tests && ./run.sh passes |
| 34 |
- an out-of-tree build works |
| 35 |
(cd .. && mkdir build && cd build && ../util-linux/configure && make) |
| 36 |
|
| 37 |
- ideally: a build with uClibc works, and --with-slang works |
| 38 |
|
| 39 |
See also |
| 40 |
-------- |
| 41 |
|
| 42 |
../README |