| 1 |
C Copyright(C) 1999-2020 National Technology & Engineering Solutions |
| 2 |
C of Sandia, LLC (NTESS). Under the terms of Contract DE-NA0003525 with |
| 3 |
C NTESS, the U.S. Government retains certain rights in this software. |
| 4 |
C |
| 5 |
C See packages/seacas/LICENSE for details |
| 6 |
|
| 7 |
SUBROUTINE SHAPEF (ITYPE,SP,TP,RP,SOLN,BVALUE) |
| 8 |
|
| 9 |
C ****************************************************************** |
| 10 |
|
| 11 |
C SUBROUTINE TO EVALUATE THE SOLUTION AT A POINT (SP,TP,RP) |
| 12 |
C WITHIN AN ELEMENT |
| 13 |
|
| 14 |
C Called by INTRPE & INTRPN |
| 15 |
|
| 16 |
C ****************************************************************** |
| 17 |
|
| 18 |
C SP INT The KSI isoparametric coord of the point in the element |
| 19 |
C TP INT The ETA isoparametric coord of the point in the element |
| 20 |
C RP INT The PHI isoparametric coord of the point in the element |
| 21 |
C SOLN REAL The variables at the nodes of the element |
| 22 |
C BVALUE REAL The value of the variable at the point inside the element |
| 23 |
|
| 24 |
C ****************************************************************** |
| 25 |
|
| 26 |
DIMENSION SOLN(*) |
| 27 |
|
| 28 |
C ****************************************************************** |
| 29 |
|
| 30 |
C SELECT TYPE OF ELEMENT |
| 31 |
|
| 32 |
GO TO (10, 20, 30, 40, 50, 60, 70, 80, 90, 100, 110, 120), ITYPE |
| 33 |
|
| 34 |
C 3-NODE TRIANGLE |
| 35 |
|
| 36 |
10 CONTINUE |
| 37 |
PP=1.-SP-TP |
| 38 |
BVALUE=SOLN(1)*SP+SOLN(2)*TP+SOLN(3)*PP |
| 39 |
RETURN |
| 40 |
|
| 41 |
C 6-NODE TRIANGLE |
| 42 |
|
| 43 |
20 CONTINUE |
| 44 |
PP=1.-SP-TP |
| 45 |
BVALUE=SOLN(1)*SP*(2.*SP-1.)+SOLN(2)*TP*(2.*TP-1.)+ |
| 46 |
1 SOLN(3)*PP*(2.*PP-1.)+SOLN(4)*4.*SP*TP+ |
| 47 |
2 SOLN(5)*4.*TP*PP+SOLN(6)*4.*SP*PP |
| 48 |
RETURN |
| 49 |
|
| 50 |
C 4-NODE QUADRILATERAL |
| 51 |
|
| 52 |
30 CONTINUE |
| 53 |
BVALUE=.25*(SOLN(1)*(1.-SP)*(1.-TP)+SOLN(2)*(1.+SP)*(1.-TP)+ |
| 54 |
1 SOLN(3)*(1.+SP)*(1.+TP)+SOLN(4)*(1.-SP)*(1.+TP)) |
| 55 |
RETURN |
| 56 |
|
| 57 |
C 8-NODE QUADRILATERAL |
| 58 |
|
| 59 |
40 CONTINUE |
| 60 |
BVALUE=.25*(SOLN(1)*(1.-SP)*(1.-TP)*(-SP-TP-1.)+ |
| 61 |
1 SOLN(2)*(1.+SP)*(1.-TP)*(SP-TP-1.)+ |
| 62 |
2 SOLN(3)*(1.+SP)*(1.+TP)*(SP+TP-1.)+ |
| 63 |
3 SOLN(4)*(1.-SP)*(1.+TP)*(-SP+TP-1.))+ |
| 64 |
4 .50*(SOLN(5)*(1.-SP*SP)*(1.-TP)+ |
| 65 |
5 SOLN(6)*(1.+SP)*(1.-TP*TP)+ |
| 66 |
6 SOLN(7)*(1.-SP*SP)*(1.+TP)+ |
| 67 |
7 SOLN(8)*(1.-SP)*(1.-TP*TP)) |
| 68 |
RETURN |
| 69 |
|
| 70 |
C 9-NODE QUADRILATERAL |
| 71 |
|
| 72 |
50 CONTINUE |
| 73 |
BVALUE=.25*(SOLN(1)*(1.-SP)*(1.-TP)*(SP*TP)+ |
| 74 |
1 SOLN(2)*(1.+SP)*(1.-TP)*(-SP*TP)+ |
| 75 |
2 SOLN(3)*(1.+SP)*(1.+TP)*(SP*TP)+ |
| 76 |
3 SOLN(4)*(1.-SP)*(1.+TP)*(-SP*TP))+ |
| 77 |
4 .50*(SOLN(5)*(1.-SP*SP)*(1.-TP)*(-TP)+ |
| 78 |
5 SOLN(6)*(1.+SP)*(1.-TP*TP)*SP+ |
| 79 |
6 SOLN(7)*(1.-SP*SP)*(1.+TP)*TP+ |
| 80 |
7 SOLN(8)*(1.-SP)*(1.-TP*TP)*(-SP))+ |
| 81 |
8 SOLN(9)*(1.-SP*SP)*(1.-TP*TP) |
| 82 |
RETURN |
| 83 |
|
| 84 |
C 4-NODE TETRAHEDRON |
| 85 |
|
| 86 |
60 CONTINUE |
| 87 |
PP=1.-SP-TP-RP |
| 88 |
C BVALUE=SOLN(1)*SP+SOLN(2)*TP+SOLN(3)*RP+SOLN(4)*PP |
| 89 |
C fix gww 8/24/00 - probably same fix for 10-node tet but not done yet |
| 90 |
C merlin had opposite nodal order (left hand rule for + volume) |
| 91 |
|
| 92 |
BVALUE=SOLN(1)*SP+SOLN(2)*TP+SOLN(3)*PP+SOLN(4)*RP |
| 93 |
RETURN |
| 94 |
|
| 95 |
C 10-NODE TETRAHEDRON |
| 96 |
|
| 97 |
70 CONTINUE |
| 98 |
PP=1.-SP-TP-RP |
| 99 |
BVALUE= SOLN(1)*SP*(2.*SP-1.)+SOLN(2)*TP*(2.*TP-1.)+ |
| 100 |
1 SOLN(3)*RP*(2.*RP-1.)+SOLN(4)*PP*(2.*PP-1.)+ |
| 101 |
2 4.*(SOLN(5)*SP*TP+SOLN(6)*TP*RP+SOLN(7)*RP*SP+ |
| 102 |
3 SOLN(8)*SP*PP+SOLN(9)*TP*PP+SOLN(10)*RP*PP) |
| 103 |
RETURN |
| 104 |
|
| 105 |
C 6-NODE PRISM |
| 106 |
|
| 107 |
80 CONTINUE |
| 108 |
PP=1.-SP-TP |
| 109 |
BVALUE=(SOLN(1)*SP+SOLN(2)*TP+SOLN(3)*PP)*.5*(1.-RP)+ |
| 110 |
1 (SOLN(4)*SP+SOLN(5)*TP+SOLN(6)*PP)*.5*(1.+RP) |
| 111 |
RETURN |
| 112 |
|
| 113 |
C 15-NODE PRISM |
| 114 |
|
| 115 |
90 CONTINUE |
| 116 |
PP=1.-SP-TP |
| 117 |
AA=1.-RP |
| 118 |
BB=1.+RP |
| 119 |
CC=1.-RP**2 |
| 120 |
BVALUE=.5*(SOLN(1)*SP*((2.*SP-1.)*AA-CC)+ |
| 121 |
1 SOLN(2)*TP*((2.*TP-1.)*AA-CC)+ |
| 122 |
2 SOLN(3)*PP*((2.*PP-1.)*AA-CC)+ |
| 123 |
3 SOLN(4)*SP*((2.*SP-1.)*BB-CC)+ |
| 124 |
4 SOLN(5)*TP*((2.*TP-1.)*BB-CC)+ |
| 125 |
5 SOLN(6)*PP*((2.*PP-1.)*BB-CC))+ |
| 126 |
6 2.*AA*(SOLN(7)*SP*TP+SOLN(8)*TP*PP+SOLN(9)*PP*SP)+ |
| 127 |
7 (SOLN(10)*SP+SOLN(11)*TP+SOLN(12)*PP)*CC+ |
| 128 |
8 2.*BB*(SOLN(13)*SP*TP+SOLN(14)*TP*PP+SOLN(15)*PP*SP) |
| 129 |
RETURN |
| 130 |
|
| 131 |
C 8-NODE HEX |
| 132 |
|
| 133 |
100 CONTINUE |
| 134 |
BVALUE=.125*(SOLN(1)*(1.-SP)*(1.-TP)*(1.-RP)+ |
| 135 |
1 SOLN(2)*(1.+SP)*(1.-TP)*(1.-RP)+ |
| 136 |
2 SOLN(3)*(1.+SP)*(1.+TP)*(1.-RP)+ |
| 137 |
3 SOLN(4)*(1.-SP)*(1.+TP)*(1.-RP)+ |
| 138 |
4 SOLN(5)*(1.-SP)*(1.-TP)*(1.+RP)+ |
| 139 |
5 SOLN(6)*(1.+SP)*(1.-TP)*(1.+RP)+ |
| 140 |
6 SOLN(7)*(1.+SP)*(1.+TP)*(1.+RP)+ |
| 141 |
7 SOLN(8)*(1.-SP)*(1.+TP)*(1.+RP)) |
| 142 |
RETURN |
| 143 |
|
| 144 |
C 20-NODE HEX |
| 145 |
|
| 146 |
110 CONTINUE |
| 147 |
AA=.125*(SOLN(1)*(1.-SP)*(1.-TP)*(1.-RP)*(-SP-TP-RP-2.)+ |
| 148 |
1 SOLN(2)*(1.+SP)*(1.-TP)*(1.-RP)*(SP-TP-RP-2.)+ |
| 149 |
2 SOLN(3)*(1.+SP)*(1.+TP)*(1.-RP)*(SP+TP-RP-2.)+ |
| 150 |
3 SOLN(4)*(1.-SP)*(1.+TP)*(1.-RP)*(-SP+TP-RP-2.)+ |
| 151 |
4 SOLN(5)*(1.-SP)*(1.-TP)*(1.+RP)*(-SP-TP+RP-2.)+ |
| 152 |
5 SOLN(6)*(1.+SP)*(1.-TP)*(1.+RP)*(SP-TP+RP-2.)+ |
| 153 |
6 SOLN(7)*(1.+SP)*(1.+TP)*(1.+RP)*(SP+TP+RP-2.)+ |
| 154 |
7 SOLN(8)*(1.-SP)*(1.+TP)*(1.+RP)*(-SP+TP+RP-2.)) |
| 155 |
BB=.250*(SOLN(9)*(1.-SP**2)*(1.-TP)*(1.-RP)+ |
| 156 |
1 SOLN(10)*(1.+SP)*(1.-TP**2)*(1.-RP)+ |
| 157 |
2 SOLN(11)*(1.-SP**2)*(1.+TP)*(1.-RP)+ |
| 158 |
3 SOLN(12)*(1.-SP)*(1.-TP**2)*(1.-RP)+ |
| 159 |
4 SOLN(13)*(1.-SP)*(1.-TP)*(1.-RP**2)+ |
| 160 |
5 SOLN(14)*(1.+SP)*(1.-TP)*(1.-RP**2)+ |
| 161 |
6 SOLN(15)*(1.+SP)*(1.+TP)*(1.-RP**2)+ |
| 162 |
7 SOLN(16)*(1.-SP)*(1.+TP)*(1.-RP**2)+ |
| 163 |
8 SOLN(17)*(1.-SP**2)*(1.-TP)*(1.+RP)+ |
| 164 |
9 SOLN(18)*(1.+SP)*(1.-TP**2)*(1.+RP)+ |
| 165 |
$ SOLN(19)*(1.-SP**2)*(1.+TP)*(1.+RP)+ |
| 166 |
$ SOLN(20)*(1.-SP)*(1.-TP**2)*(1.+RP)) |
| 167 |
BVALUE=AA+BB |
| 168 |
RETURN |
| 169 |
|
| 170 |
C 27-NODE HEX |
| 171 |
|
| 172 |
120 CONTINUE |
| 173 |
AA=.125*(-SOLN(1)*SP*TP*RP*(1.-SP)*(1.-TP)*(1.-RP) |
| 174 |
1 +SOLN(2)*SP*TP*RP*(1.+SP)*(1.-TP)*(1.-RP) |
| 175 |
2 -SOLN(3)*SP*TP*RP*(1.+SP)*(1.+TP)*(1.-RP) |
| 176 |
3 +SOLN(4)*SP*TP*RP*(1.-SP)*(1.+TP)*(1.-RP) |
| 177 |
4 +SOLN(5)*SP*TP*RP*(1.-SP)*(1.-TP)*(1.+RP) |
| 178 |
5 -SOLN(6)*SP*TP*RP*(1.+SP)*(1.-TP)*(1.+RP) |
| 179 |
6 +SOLN(7)*SP*TP*RP*(1.+SP)*(1.+TP)*(1.+RP) |
| 180 |
7 -SOLN(8)*SP*TP*RP*(1.-SP)*(1.+TP)*(1.+RP)) |
| 181 |
BB=.250*(+SOLN (9)*TP*RP*(1.-SP**2)*(1.-TP)*(1.-RP) |
| 182 |
1 -SOLN(10)*SP*RP*(1.+SP)*(1.-TP**2)*(1.-RP) |
| 183 |
2 -SOLN(11)*TP*RP*(1.-SP**2)*(1.+TP)*(1.-RP) |
| 184 |
3 +SOLN(12)*SP*RP*(1.-SP)*(1.-TP**2)*(1.-RP) |
| 185 |
4 +SOLN(13)*SP*TP*(1.-SP)*(1.-TP)*(1.-RP**2) |
| 186 |
5 -SOLN(14)*SP*TP*(1.+SP)*(1.-TP)*(1.-RP**2) |
| 187 |
6 +SOLN(15)*SP*TP*(1.+SP)*(1.+TP)*(1.-RP**2) |
| 188 |
7 -SOLN(16)*SP*TP*(1.-SP)*(1.+TP)*(1.-RP**2)) |
| 189 |
CC=.250*(-SOLN(17)*TP*RP*(1.-SP**2)*(1.-TP)*(1.+RP) |
| 190 |
1 +SOLN(18)*SP*RP*(1.+SP)*(1.-TP**2)*(1.+RP) |
| 191 |
2 +SOLN(19)*TP*RP*(1.-SP**2)*(1.+TP)*(1.+RP) |
| 192 |
3 -SOLN(20)*SP*RP*(1.-SP)*(1.-TP**2)*(1.+RP))+.500*(-SOLN(2 |
| 193 |
41)*TP*(1.-SP**2)*(1.-TP)*(1.-RP**2) +SOLN(2 |
| 194 |
52)*SP*(1.+SP)*(1.-TP**2)*(1.-RP**2) +SOLN(2 |
| 195 |
63)*TP*(1.-SP**2)*(1.+TP)*(1.-RP**2) -SOLN(2 |
| 196 |
74)*SP*(1.-SP)*(1.-TP**2)*(1.-RP**2) -SOLN(2 |
| 197 |
85)*RP*(1.-SP**2)*(1.-TP**2)*(1.-RP) +SOLN(2 |
| 198 |
96)*RP*(1.-SP**2)*(1.-TP**2)*(1.+RP))+SOLN(27)*(1.-SP**2)*(1.-TP**2 |
| 199 |
$)*(1.-RP**2) |
| 200 |
BVALUE=AA+BB+CC |
| 201 |
RETURN |
| 202 |
|
| 203 |
END |