Debian Codegraph @

share/E/E3A03

raw
1 E3A03 (A)
2 When scheduling EME contacts, which of these conditions will generally result in the least path loss?
3 A. When the Moon is at perigee
4 B. When the Moon is full
5 C. When the Moon is at apogee
6 D. When the MUF is above 30 MHz